Built in India,
for the AI decade.
HyperNext Data Center Limited is a public limited company, incorporated to build hyperscale AI-native data center infrastructure across India and Africa. Headquartered in Hyderabad, registered with the Ministry of Corporate Affairs, India.
The company, on the record.
The same book we would hand a procurement team, dated throughout and built to be checked. Read it here, page by page.
Arrows or tap a side to turn · swipe on touch · Fullscreen for a larger read
From a one-bedroom apartment in Toronto to a 1.2 GW AI factory.
Seventeen years of engineering work. One continuous arc. The lineage is short to write down and long to live through.
Scriptics begins.
A one-bedroom apartment in Toronto. The work was small. The ambition was not. The original setup, photographed.
The India office opens.
The first physical office in India. The team scales. From here, the work goes global.
The HyperNext brand is born.
The hyperscale data center vertical earns its own name. HyperNext begins, with a clear remit: build the Responsible Hyperscaler. The Hyderabad office, photographed.
HN-1 Phase 1 breaks ground.
The first HyperNext facility starts construction. The BFSI anchor campus. 64 MW of Phase 1 capacity, planned commissioning December 2026. The first stone of a much larger plan.
Forbes India Select 200.
Scriptics Technologies, the parent of HyperNext, is named to the Forbes India Select 200 cohort at the DGEMS 2024 Summit, recognising companies with exceptional global business potential. The recognition reflects seventeen years of disciplined engineering. The work continues at the scale this decade now asks for.
The Nagmati Programme begins.
HyperNext makes its first major CSR commitment: a ₹5 crore programme to restore the Nagmati watershed in Kutch, Gujarat. Recharge weirs, percolation wells and channel works, engineered to return more freshwater to the ground than the company consumes. The first project under #aiwithoutthirst.
The South Africa agreement is signed.
110 MW international gateway facility. The first HyperNext footprint outside India. Designed to anchor BFSI, sovereign workloads, and the next leg of African digital infrastructure.
The Andhra Pradesh Government Order is signed.
The Memorandum of Understanding for the Kakinada campus is formalised at the Government of Andhra Pradesh signing ceremony, "India's Sunrise State". State backing for the flagship 1.2 GW AI Factory, and the foundation on which the campus is built.
Kakinada is finalised as the 1.2 GW AI Factory.
India's flagship hyperscale AI campus. 350 acres in Kakinada Industrial City. NVIDIA Vera Rubin Ultra NVL576 and AMD Helios rack-scale GPU systems. Engineered for the workloads that will define the decade. Coverage in The Times of India and across industry trackers.
The HN-1 220 kV substation is energised.
Power before racks. The dedicated 220 kV substation for the HN-1 anchor campus comes online. Grid-scale transmission capacity secured and commissioned. The hardest infrastructure, delivered first, exactly as planned.
Chhattisgarh land finalised.
The Nava Raipur campus is approved and the land finalised. At the Chhattisgarh Investors Connect in Hyderabad, HyperNext was handed the project documents and approval, a ₹4,200 crore data center, the single largest investment announced at the meet, with Chief Minister Vishnu Deo Sai presiding over the handover. 100 MW. India's first purpose-built Disaster Recovery as a Service campus, with a zero-downtime SLA on the hot tier.
Ground broken at HN-5.
The first HyperNext campus to break ground outside India. 192 MW, liquid cooled end to end, built for AMD Helios rack-scale systems, live from January 2028. The same 800 VDC and direct-to-chip architecture as the Indian campuses, on the doorstep of Singapore.
Selective acquisitions in the IT supply chain.
Plans take shape for targeted acquisitions across the data center IT supply chain, across server, networking and component layers. The goal: bring critical hardware capability in-house. Faster cycles. Tighter quality. Lower total cost of build. India-built, by design.
The work continues.
Three campuses in India. Two international campuses, Johannesburg and Johor Bahru. Five Build-to-Suit sites. 2.7 GW of captive renewable energy by 2028. Net Zero by 2030. The same discipline that started in a one-bedroom apartment, applied at the scale this decade now requires.
We are the
Responsible Hyperscaler®
A hyperscaler that secures power before it pours concrete, cools without drinking the water table, and builds the hard parts itself. Responsible is not a label we added at the end. It is how the whole thing is engineered, from the power up.
Power-first
We secured 330 MW power allocation in Telangana before pouring a single slab of concrete. We own 700 MW of captive solar at Khavda today, with 2 GW more in planning.
AI-native architecture
India's first 800VDC data center architecture, engineered around the rack-scale systems coming from NVIDIA, AMD and HPE. Built for the workloads of 2028.
Responsibly built
#aiwithoutthirst. Our Nagmati River project has saved 5+ billion litres of freshwater. Our captive renewables programme powers the next gigawatts.
The hardest things,
first.
Real scale is not how fast a slab is poured. It is power readiness. Transmission. Partnerships. The discipline to plan in decades, not quarters. That is the order we work in.
Power before concrete
Before construction began on our flagship Hyderabad campus, we secured a 330 MW allocation from Telangana State Transmission Corporation. Our dedicated substation was designed, approved and energised in 18 months. While the industry waits for transmission, ours is already on the grid.
Architecture for 2028, not 2018
We did not retrofit a legacy facility for AI. We engineered around 800VDC power delivery, direct liquid cooling, and rack-scale systems from NVIDIA, AMD and HPE. Built for the workloads of the next decade, not the last one.
Sustainability is operational
700 MW of captive solar already generating in Khavda, Kutch. 5 billion litres of freshwater saved through our Nagmati River programme. Measurable, today. We do not publish targets and call them strategy.
Partners that define the category
NVIDIA, AMD, HPE, IBM, Hitachi Vantara on compute and platform. Delta, Eaton, Schneider Electric, Kirloskar on power, cooling and standby. Each chosen for one reason. They are the best in the world at what they do.
From discovery to
go-live.
A simple engagement framework. From the first conversation, through to handover. Clarity at every stage.
Discovery
We start with a Customer Requirements Form, capturing workload profile, capacity ramp, geography, compliance and commercial preferences. NDA-protected from day one.
Solution Design
Engineering, commercial and operations teams co-build a solution, site selection, capacity phasing, power topology, cooling strategy, network architecture, and SLA framework.
Commercial Proposal
A single proposal covering pricing model, payment terms, contract tenure, escalation, exit support, and the master services agreement that will govern the relationship.
Build & Commission
Civil possession through to L1-L5 commissioning tests. As-built documentation, BMS schemas, and O&M handbooks delivered at acceptance.
Go-Live
Customer acceptance testing, white-space readiness, and phased go-live aligned to your ramp. Day-1 operations under HyperNext's 24×7 NOC/SOC.
Steady-State Operations
ITIL-aligned operations, single-pane DCIM, tiered remote hands, preventive maintenance and a service-credits regime backed by clear SLAs.
How we work
with you.
From retail colocation through to full Build-Own-Operate-Transfer. Pick the commercial model that matches your strategy.
Colocation, Retail
Single racks to multi-rack deployments.
Colocation, Wholesale
Dedicated halls and private suites.
Build-to-Suit (BTS)
Bespoke facilities for named customers.
Build & Operate
We build, you brand. We run the operations.
BOOT
Build-Own-Operate-Transfer for long-tenure customers.
Hyperscale Lease
Multi-MW commitments with phased ramp.
Edge Deployment
Latency-sensitive workloads, closer to users.
Disaster Recovery
Geo-separated DR with sync / async replication.
Engineered for
regulated workloads.
We serve the industries where the auditor is in the room. Where the wrong infrastructure decision is a board-level decision. Where the wrong choice has a name.
Banking & Finance
Core banking, payments, capital markets, lending and insurance. 10 anchor banking tenants confirmed at our Hyderabad campus.
Government & Defence
Central and state government workloads, defence research, citizen data and national digital infrastructure projects.
Healthcare & Life Sciences
Hospital systems, electronic health records, diagnostic AI, drug discovery, genomic platforms and clinical research.
Manufacturing & Industry 4.0
Industrial AI, predictive maintenance, computer vision for quality, digital twin of factories, supply-chain optimisation.
Telecom & Media
O-RAN intelligent controllers, network analytics, content delivery, broadcast infrastructure and streaming platforms.
Energy & Utilities
Grid optimisation, energy trading, renewable forecasting, OT-IT convergence and smart-metering analytics.
Aerospace & Strategic
Satellite data processing, aerospace simulation, dual-use technology workloads and export-controlled R&D.
Education & Research
HPC for institutional research, sovereign AI for academic LLMs, federated learning across universities.
The companies we
build and back.
HyperNext sits inside a small group of technology companies. Some we founded, some we invest in. Each is run to the same standard we hold ourselves to.

Quantloop builds intelligent loops: applied-AI systems that turn raw signals into intelligence that keeps learning. Its products include the PhantomCat market-intelligence indicator and VBox, a vertical experience platform, with the same loop engine now reaching into other industries.
quantloop.tech ›
An end-to-end software and AI solutions provider, from enterprise engineering and automation to data, geospatial intelligence and blockchain. A team of 230 professionals, 15 years in business.
scriptics.ai ›The AI-powered operating system for sports academies. Coaching, performance analytics, scheduling, role-based access and live streaming in one platform, with 40+ features, an eight-tool AI coaching engine and an 18-tool cricket intelligence suite across tennis, pickleball, badminton and cricket.
instring.co.in ›Engineered to global
benchmarks.
Every HyperNext facility is designed, built, and operated to align with the most rigorous global standards. Infrastructure. Security. Environment. Business continuity. The list below is the framework. Certification audits are scheduled against each facility's commissioning timeline.
Built to the standards that define the category.
- Uptime Institute Tier III & Tier IVDesign and constructed-facility certification
- ANSI/TIA-942Tier III and Tier IV telecommunications infrastructure
- BICSI 002Data center design and implementation standard
Audit-ready security posture, day one.
- ISO/IEC 27001Information Security Management Systems
- ISO/IEC 27017Cloud Services Security Controls
- ISO/IEC 27018Protection of Personally Identifiable Information in Public Cloud
- SOC 1 Type IIInternal Controls over Financial Reporting
- SOC 2 Type IISecurity, Availability, Processing Integrity, Confidentiality
Operating excellence as a discipline.
- ISO 9001Quality Management Systems
- ISO 14001Environmental Management Systems
- ISO 45001Occupational Health and Safety Management
- ISO 50001Energy Management Systems
Resilient by design.
- ISO 22301Business Continuity Management Systems
- NIST Cybersecurity FrameworkIdentify, Protect, Detect, Respond, Recover
- NIST SP 800-53Security and Privacy Controls
- CSA STARCloud Security Alliance assurance framework
Built for regulated sectors.
- PCI DSSPayment Card Industry Data Security Standard
- HIPAAHealthcare data privacy (US healthcare workloads)
- HITRUST CSFCommon Security Framework for healthcare and regulated industries
- RBI Data LocalisationReserve Bank of India guidelines for BFSI customers
- SEBI Cybersecurity FrameworkSecurities and Exchange Board of India compliance
Aligned to the ESG benchmarks our customers report against.
- LEED (Leadership in Energy and Environmental Design)Targeting LEED Gold for new builds, LEED Platinum for flagship Kakinada
- IGBC Green Data Center RatingIndian Green Building Council certification
- RE100 Aligned100% renewable electricity commitment
- CDP Climate DisclosureCarbon Disclosure Project reporting framework
What we own,
and what we protect.
The HyperNext brand, the marks we trade under and the engineering behind the platform are the intellectual property of HyperNext Data Center Limited (CIN U63111TS2025PLC204792).
Registered trademarks
HyperNext and the HyperNext logo, Responsible Hyperscaler® and This is What's Next® are registered trademarks of HyperNext Data Center Limited. They may not be used without written permission.
29 granted, 14 pending
Patents granted and under approval across our 800VDC power architecture, electrical efficiency, liquid cooling and AI workload orchestration. See the portfolio.
Proprietary attestation
The Evidence Layer, our cryptographic attestation system for the Hyper 7 sovereign cloud, is proprietary to HyperNext. Its commitments are contractually backed and verifiable on demand. Trust Center.
Licensing & permissions
For trademark, patent licensing or brand-use enquiries, write to [email protected].
Common questions.
Straight answers to what hyperscalers, enterprises, partners and suppliers ask us most, with links to the detail. For anything not covered here, write to [email protected].
What is 800VDC, and why does it matter?
Where do Vera Rubin and Helios deploy across your campuses?
Why offer both NVIDIA and AMD?
How does the IBM partnership work?
What is the Kirloskar genset order?
How much water does a HyperNext data center use?
What are your environmental commitments?
What sustainability is operational today, not just promised?
What commercial models do you support?
How do partnerships, JVs and contracts work?
How do I respond to an RFP or become a supplier?
How do you acquire land, including brownfield sites?
How do I start a conversation?
Are you hiring?
Talk to HyperNext.
One inbox, watched every working day. Two continents. Four offices.
Every enquiry, commercial or technical, reaches the same inbox and gets a reply within one working day.
HyperNext Data Center Limited
P.NO.9, Bldg No.9, Sy.No.64, Mind Space, B/H VSNL Bldg, Jubilee Hills, Hyderabad, Telangana 500033, India
Mumbai
WeWork BKC
Bandra Kurla Complex
Mumbai 400051
Bangalore
Bagmane Tech Park
Mahadevapura
Bengaluru 560048
Ahmedabad
Navratna Corporate Park, Tower A
Ambli Bopal Road
Ahmedabad 380058
Toronto
181 Bay Street
Toronto, ON M5J 2T3
Canada
