Build the
AI decade
with us.
If you want to build infrastructure that matters, at hyperscale, with real engineering challenges, and with the discipline to do it sustainably, write to us.
A platform that does the
hardest things first.
We secured power before pouring concrete. We built renewable generation before signing colo deals. We chose 800VDC before retrofitting was an option. If you're someone who runs toward the difficult problem, you'll fit in here.
Engineering-led
Decisions are made on first principles. We work with the world's best, NVIDIA, AMD, HPE, IBM, Hitachi, Schneider, Eaton, Delta, Kirloskar, because the work demands it.
Hyperscale, hands-on
You won't ship slideware here. From a 1.2 GW AI Factory in Kakinada to 192 MW in Johor Bahru to 110 MW in Johannesburg, these are real campuses, on real timelines, with real customers.
Responsibly built
#aiwithoutthirst is not a marketing line. Our Nagmati programme, our 700 MW captive solar, our 800VDC architecture, every choice is filtered through water, energy and material discipline.
Where we're hiring.
We are hiring across engineering, operations, commercial and corporate functions. If your discipline isn't listed but you believe you can contribute, write to us anyway.
Electrical Engineering
HV / MV / LV design · 800VDC · Substations · UPS / Gensets
Mechanical / HVAC
Liquid cooling · Chiller plants · CRAH/CRAC · Containment
Network Engineering
DWDM · Fibre · Meet-Me-Room · Carrier interconnect
Critical Operations
NOC / SOC · DCIM · Incident response · Change management
Construction & PM
Civil structures · MEP · Commissioning L1-L5 · QA/QC
Sales & BD
Hyperscale · BFSI · BTS · Wholesale colo · Hyderabad & Mumbai based
Solution Architecture
AI workload sizing · Capacity planning · TCO modelling · Customer engineering
Corporate Functions
Finance · Legal · HR · Communications · Procurement


Open plan, shared aisles, no corner offices. The people who argue it out are the ones who answer for it.
Three steps.
No nonsense.
Write to us
Send your CV and a short note about the work you want to do to [email protected]. Reference the role family above if it matches.
Technical conversation
If there's a fit, we'll set up a working conversation with the function lead. Depth over theatre, we want to understand how you think, not how you interview.
Site visit & offer
Visit our Hyderabad office, meet the leadership, walk through what you'd own. If we both agree, we move fast on the offer.
