Partners & OEMs

Built with the
best.

Twelve global leaders. One infrastructure platform. Every layer of HyperNext, from accelerated compute and rack systems to power, cooling, standby generation, networking and security, is engineered with partners who define the state of the art in their categories.

Compute & Platform
nvidia
// Accelerated Compute
Vera Rubin NVL144 · Vera Rubin Ultra NVL576

India's first Vera Rubin rack-scale deployment.

HyperNext is the first Indian data center operator to deploy NVIDIA's Vera Rubin platform as a rack-scale system. Our 1.2 GW Kakinada AI Factory is being purpose-built to host Vera Rubin Ultra NVL576 at scale, engineered around the 800VDC power architecture these systems are designed for.

Products & platforms
Vera Rubin NVL144Vera Rubin Ultra NVL576NVLink FabricCUDA Stack
  • India's first Vera Rubin NVL144 deployment
  • Vera Rubin Ultra NVL576 at Kakinada AI Factory
  • 800VDC-native power delivery
  • Liquid-cooling-ready white space
amd
// Open AI Compute
Helios Rack-Scale System

The open alternative for next-generation AI.

Our partnership with AMD brings the Helios rack-scale system to India, a genuinely open platform that can reshape the country's AI infrastructure market. Helios is built for the full spectrum of next-generation AI workloads, from inferencing and retrieval-augmented generation through to physical AI and scientific computing.

Products & platforms
Helios Rack-ScaleInstinct MI AcceleratorsROCm Software StackInfinity Fabric
  • AMD Helios rack-scale system
  • Open architecture, customer choice
  • Optimised for inferencing & RAG
  • Ready for physical & scientific AI
hpe
// Enterprise Servers · Rack-Scale GPU
Compute Infrastructure

Enterprise servers and rack-scale GPU systems.

HPE supplies our enterprise server estate alongside the rack-scale GPU systems we deploy with NVIDIA and AMD silicon. We chose HPE for the reasons HPE has always been chosen. Engineering rigour, supply discipline, and a long memory for what enterprise infrastructure is meant to do.

  • Enterprise server infrastructure
  • Rack-scale GPU systems with NVIDIA & AMD
  • Tight integration with our 800VDC architecture
  • Indian engineering and support presence
ibm
// Enterprise & BFSI
Power · Mainframe

Power-as-a-Service & Mainframe-as-a-Service, direct to BFSI.

Through our partnership with IBM, HyperNext delivers IBM Power and IBM Mainframe directly as managed services for BFSI customers, eliminating the layers of intermediaries that have historically sat between Indian banks and the platforms they run on. Lower cost, faster onboarding, accountable SLAs.

Products & platforms
IBM Power SystemsIBM Z MainframeAIX · IBM i · Linux on Powerz/OS
  • IBM Power-as-a-Service
  • IBM Mainframe-as-a-Service
  • Built for banking workloads
  • No middleman, no mark-up
hitachi
// Storage
Storage Systems

Storage built for the data weight of AI.

Hitachi Vantara provides the high-performance, low-latency storage infrastructure underpinning every AI workload on HyperNext, from VSP block arrays for transactional systems to scale-out object stores for training datasets and model checkpoints. Built for the data gravity of AI at hyperscale.

Products & platforms
Virtual Storage Platform (VSP)HCP Object StoragePentaho Data FabricOps Center
  • High-IOPS block for transactional AI
  • Exabyte-scale object storage
  • Data fabric across hybrid cloud
  • AIOps-driven operations
Power, Cooling & Infrastructure
delta
// 800VDC · UPS · Cooling
Delta Electronics

Power conversion engineered for 800VDC.

Delta's high-efficiency power and thermal systems are critical across our 800VDC architecture, from utility-grade rectifiers to rack-level DC distribution, modular UPS, and precision cooling for high-density halls. Decades of engineering in DC power infrastructure, applied directly to India's first AI-native data centers.

Products & platforms
High-Efficiency RectifiersModular UPSInfraSuite DCIMRowCool · CRAH
  • High-efficiency DC rectifiers
  • 800VDC distribution components
  • Modular UPS systems
  • Precision cooling for high density
eaton
// UPS · Switchgear · Cooling
Power Management

Continuity at the scale of an AI Factory.

Eaton's UPS, switchgear and thermal management platforms deliver the redundancy our customers need, from N+1 through 2N topologies, sized for hyperscale AI workloads with critical-load characteristics and 100 kW+ rack densities.

Products & platforms
Power Xpert 9395 UPSxStorage EnergySwitchgear & DistributionLiquid Cooling
  • Hyperscale UPS systems
  • N+1 and 2N redundancy
  • Switchgear & distribution
  • Liquid cooling for AI density
schneider
// DC Infrastructure · Cooling
Schneider Electric

End-to-end infrastructure for AI-native operations.

Schneider Electric's integrated approach to power, cooling and digital infrastructure management gives us a single operational pane of glass across every facility, from Kakinada to Johannesburg, from white space to rack PDU. The EcoStruxure platform connects every layer of our infrastructure.

Products & platforms
EcoStruxure DCIMGalaxy VL UPSUniflair CoolingNetShelter Rack PDU
  • EcoStruxure DCIM platform
  • Integrated cooling & containment
  • Rack PDU & distribution
  • Prefabricated modular DC solutions
kirloskar
// Standby Power · Gensets
Kirloskar Oil Engines · Optiprime

India's #1 genset brand, engineered for the AI decade.

Kirloskar Oil Engines (KOEL) has developed the new Optiprime series specifically to meet hyperscale data center demand. Patented hybrid technology delivers up to 40% reduction in fuel consumption and carbon emissions, CPCB IV+ compliance, and IoT-enabled remote monitoring. HyperNext has committed to deploying 4000 MVA of Optiprime standby capacity across our fleet, among the largest data center genset deployments of its kind in India.

Products & platforms
Optiprime Hybrid SeriesCPCB IV+ CompliantIoT-Enabled MonitoringUp to 2000 kVA per unit
  • 4000 MVA fleet across HyperNext sites
  • ~40% fuel & emission reduction
  • CPCB IV+ emission compliance
  • Real-time IoT diagnostics
Networking & Security
cisco
Networking · Security
Cisco Systems

The network fabric beneath every workload.

Cisco provides the data center networking backbone for HyperNext, from spine-and-leaf fabric and Nexus switching to ACI policy automation and Silicon One programmable forwarding. The same platform that runs the largest hyperscaler networks in the world, deployed at the scale our AI workloads demand. Cisco Secure firewall and Umbrella DNS-layer security extend our defence posture from the edge to the workload.

Products & platforms
Nexus 9000 SeriesSilicon One Programmable FabricACI Policy AutomationCisco Secure Firewall
  • Spine-and-leaf fabric at scale
  • 400G and 800G port density
  • ACI-based policy automation
  • Integrated workload security
paloalto
Network Security · NGFW
Palo Alto Networks

Zero Trust security at AI workload speed.

Palo Alto Networks delivers the next-generation firewall, cloud security, and AI-driven detection layer for HyperNext customers. PA-Series firewalls anchor north-south and east-west traffic inspection. Prisma Cloud extends posture management into customer multicloud environments. Cortex XSOAR and XSIAM power our SOC-as-a-Service incident response, with AI-assisted detection trained on the world's largest threat intelligence dataset.

Products & platforms
PA-Series Next-Gen FirewallPrisma CloudCortex XSIAM · XSOARUnit 42 Threat Intelligence
  • NGFW for north-south & east-west
  • Cloud security posture management
  • AI-driven detection at SOC layer
  • Unit 42 threat intelligence built in
checkpoint
Perimeter & Cloud Security
Check Point Software

Hybrid mesh security for regulated workloads.

Check Point's Infinity platform provides perimeter, cloud and workload security for HyperNext customers operating across BFSI, healthcare and government use cases. Quantum gateways protect facility ingress. CloudGuard extends consistent policy across customer hybrid and multicloud environments. Harmony secures the endpoint and identity layer. A single management plane across every threat surface for regulated industries.

Products & platforms
Quantum Security GatewaysCloudGuard CNAPPHarmony Endpoint · Email · SaaSInfinity Unified Management
  • Perimeter and DC ingress security
  • CNAPP for customer cloud workloads
  • Unified policy across hybrid mesh
  • Regulated-industry hardened posture
Become a partner

Building for the
AI decade together.

If you're an OEM or platform vendor whose technology belongs in the next generation of AI infrastructure, we'd love to talk.

Supply Chain · First-class delivery

34 vendors. 19 OEMs.
Zero excuses.

Things arrive when they should. We do not think this is exceptional. It should be the way infrastructure is built. Multi-year master agreements with every critical supplier. Ordering against a pipeline, not against an invoice. A track record we publish, quarterly.

34
Critical supplier relationships, active
19
Original equipment manufacturers, direct
3 years
Maximum tenure on rate-locked contracts
100%
On-time delivery, last 24 months
01

Multi-year master agreements

Three-year rate-locked master agreements with every OEM for critical equipment. Predictable pricing through capex cycles, guaranteed allocation through supply constraints, and clear escalation paths that do not go through a procurement helpdesk.

02

Pipeline-forecast ordering

Long-lead items, transformers, switchgear, gensets, chillers, GPU systems, ordered against a rolling 24-month pipeline forecast. Not against confirmed customer purchase orders. We carry the inventory risk so our customers do not carry the schedule risk.

03

Buffer inventory for emergencies

Spare transformers, generators and critical spares maintained at strategic locations. Emergency replacement units available with 24-hour transit to any HyperNext site. The fleet keeps running while the rest of the supply chain catches up.

04

First-class delivery commitment

Every project schedule comes with a first-class delivery commitment, backed by contractual penalty clauses we accept and our suppliers accept. On-time, on-spec, on-budget. If it slips, we pay. Not the customer.